Hollywood Hills – Rough MEP & Fire Sprinklers

CONCRETE CORING

Coring the Concrete slabs and walls for MEP penetrations

MECHANICAL

The Air Condenser Units will sit on top of the retaining wall.  The lines will run down the PVC sleeves placed at the time of the retaining wall construction, and underground to the side of the house, where it will enter the garage in the utilities area, then branch throughout the house to the individual Fan Coil Units.

 

ELECTRICAL

 

 

 

PLUMBING

FIRE SPRINKLERS