CONCRETE CORING Coring the Concrete slabs and walls for MEP penetrations MECHANICAL The Air Condenser Units will sit on top of the retaining wall. The lines will run down the PVC sleeves placed at the time of the retaining wall construction, and underground to the side of the house, where it will enter the garage