CategoryWonderland Construction
Hollywood Hills – Rough MEP & Fire Sprinklers
CONCRETE CORING Coring the Concrete slabs and walls for MEP penetrations MECHANICAL The Air Condenser Units will sit on top of the retaining wall. The lines will run down the PVC sleeves placed at the time of the retaining wall construction, and underground to the side of the house, where it will enter the garage
Hollywood Hills – Retaining Wall
The site will require a retaining wall to make room for the building pads. Per the LAMC (Los Angeles Municipal Code), we are allowed two 10’ walls nearly stacked on top of one another, for a total height of 20’ provided that the top 10’ portion of the wall is stepped back the minimum of
Hollywood Hills – 3 New Single Family Residences
The site in the Hollywood Hills is comprised of three adjoining parcels, on which a large single family house used to stand. The house was not well maintained and was eventually demolished. The current owner purchased all three parcels at the same time and designed & developed three new single family residences, one for each